01. Supply of Services to Support Facilities Maintenance and Logistics Operation

Description

The supply of services to support facilities maintenance and logistics operation

Period

Till 31 Dec 2027

Client

ST Synthesis Pte Ltd

02. Management Services for Mindef Controlled Properties

Description

Management services for mindef controlled properties in
select sites (Zone B)

Period

Till 31 Mar 2026

Client

SMM Pte Ltd

03. Supply , Deliver, Install, Test and Commission ONAN Transformer

Description

Supply , deliver, install, test and commission ONAN
transformer with new power and control ables including
disposal of existing old transformer and old cables

Period

Till 30 Apr 2026

Client

DSTA

04. Replacement of M&E System

Description

Replacement of M&E system at Cluster A (M&E Services),
Singapore Prison Services

Period

Till 28 Feb 2026

Client

SMM Pte Ltd

05. Provision of Maintenance Works Services

Description

Provision of maintenance works Services (MWS) & Ad-hoc
Works Services (AHW) for Building and Mechanical &
Electrical (M&E) Systems

Period

Till 31 Dec 2031

Client

ST Engineering Synthesis Pte Ltd

06. Building Maintenance Works At Campus

Description

Building Maintenance works at Campus for Research
Excellence and Technological Enterprise

Period

Till 11 Sep 2026

Client

National Research Foundation

07. Integrated Facilities Management Services

Description

ntegrated Facilities Management Services (Mechnical and
Electrical System) for RSAF Premises in Singapore (Zone
A)

Period

Till 30 Sep 2032

Client

SMM Pte Ltd

08. Tuas Water Replacement Plant Contract 3C

Description

Tuas Water Replacement Plant Contract 3C – Domestic
Liquids Modules – Civil and Building Services Works

Period

Till 31 Dec 2026

Client

UES Holdings Pte Ltd

09. Integrated Building Maintenance Services and A & A works

Description

ntegrated Building Maintenance Services and Addition &
Alterations works at Ministry of Home Affairs Properties
(Central Zone)

Period

Till 31 Mar 2027

Client

SMM Pte Ltd

10. Design,Supply and Installation of Electrical System

Description

Design,Supply and Installation of Electrical System at SG
Gedong Camp

Period

Till 26 Jul 2026

Client

Nippon Builders Pte Ltd

11. Integrated Facilities Management Services

Description

Integrated Facilities Management Services for RSAF
premises in Singapore (Zone B)

Period

Till 31 Mar 2027

Client

Divan Engineering Pte Ltd

12. Proposed Erection of Water Fabrication Plant

Description

Proposed erection of water fabrication plant UMC 12ip3 at
Tampines

Period

TBC

Client

3S Gowin Vision Pte Ltd

13. Subcontract for Infrastructure Upgrade

Description

Subcontract for Infrastructure Upgrade and Refresh in Tuas

Period

Till 30 Sep 2026

Client

SMM Pte Ltd

14. Proposed Erection of Integrated Waste Management Facility

Description

Proposed Erection of Integrated Waste Management Facility
(IWMF) and Ancillary Buildings on Lot 05036WMK 07 off
Tuas South Lane / Tuas South Avenue 9 (EPC Package 2)

Period

Till 31 Dec 2026

Client

UES Holdings Pte Ltd

15. Design, Supply, Manufacturing, FAT, Delivery, Installation, Testing & Commissioning of Fire Protection System

Description

Proposed Erection of Integrated Waste Management Facility
(IWMF) and Ancillary Buildings on Lot 05036WMK 07 off
Tuas South Lane / Tuas South Avenue 9 (EPC Package 2)

Period

Till 09 May 2026

Client

UES Holdings Pte Ltd

16. Provision of Integrated Building Maintenance (IBC) Services

Description

Provision of Integrated Building Maintenance (IBC) Services
at Ministry of Home Affairs Sector B Properties for Four (4)
Years with Option to Extend for Another Four (4) Years –
Bundle 1

Period

Till 30 Nov 2028

Client

SMM Pte Ltd

17. The Provision of Manpower Services

Description

The Provision of Manpower Services to Support Facilities
Maintenance and Logistics Operation

Period

Till 31 Dec 2027

Client

ST Engineering Synthesis Pte Ltd

18. Maintenance of Fire Station 2, East Satellite Fire Station

Description

Maintenance of Fire Station 2, East Satellite Fire Station
and Casualty Clearance Station 2 at Singapore Changi
Airport

Period

Till 31 Jan 2029

Client

Changi Airport Group

19. Integrated Facilities Management Services for Office Premises

Description

Integrated Facilities Management Services for Office
Premises

Period

Till Oct 2027

Client

SMM Pte Ltd